Rispri LabsENGINEERING A CIRCULAR FUTURE

INDUSTRIAL WASTEWATER AND ZLD / 07

Ready: level 9 of 9Already in useFull size

Electric treatment so tanneries discharge no wastewater.
A tannery that sends out no wastewater.

A tannery must stop sending out any wastewater, but its mixed wastewater is too hard to treat. Each type of wastewater is kept in its own line.

FACTORY WASTEWATER THAT FAILS COD, SMELLS OR MAKES TOO MUCH SLUDGEDelivered by Rispri Labs
Factory wastewater that fails COD, smells or makes too much sludge
Factory wastewater that fails COD, smells or makes too much sludge

What it achieves

The key numbers.

Zero

wastewater discharged.

35 to 40%

lower environmental cost.

Reuse

of every treated stream.

Problem and fix

The problem this solves.

  1. 01
    The problem

    A tannery must stop sending out any wastewater, but its mixed wastewater is too hard to treat.

    How it is fixed

    Each type of wastewater is kept in its own line. An electric treatment cleans each one so the water can be reused and no new pollution is made.

How it works

Step by step.

  1. 1

    Separate

    Each type of wastewater is kept in its own line.

  2. 2

    Treat

    Electric treatment cleans each stream.

  3. 3

    Reuse

    Treated streams go back into the process.

  4. 4

    Recover

    Salts and other inorganics are put to use.

Key features

Why it works well.

Zero wastewater discharge reached.

  • No new pollutionKeeping streams apart avoids mixing problems.
  • Lower costCuts environmental cost by 35 to 40%.
  • Meets zero discharge ordersWater stays inside the unit.

At a glance

The details.

TreatsTannery wastewater, stream by stream
ResultZero wastewater discharge
Savings35 to 40% lower environmental cost
Ready levelLevel 9 of 9 (already in use)
ScaleFull size
Used inLeather

Costs are indicative and change with your water, site and plant size. We confirm them after testing a sample.

Where it is used

Who it is for.

  • Tanneries
  • Leather clusters

Questions

Frequently asked questions.

Is this technology proven?

Yes. It is at ready level 9 of 9, which means: already in use. Zero wastewater discharge reached.

Can we try it on our own water first?

Yes. We test a sample in our NABL-accredited lab and, where it helps, run a small trial on your site before you invest in a full plant.

Do you supply and install it?

Yes. We design, supply, install and start up the system, train your staff, and our lab checks the treated water.

THE NEXT STEP

Fix it on
your own site.

Send us a water sample or a test report. We will check it, confirm this method fits and tell you what it costs to run.

Discuss your problem