Sewage or factory wastewater needs cleaning with very little sludge left over. Air and wastewater keep carbon granules moving in a tank.
What it achieves
The key numbers.
per 1,000 litres to run.
largest plant built.
in one reactor.
Problem and fix
The problem this solves.
- 01The problem
Sewage or factory wastewater needs cleaning with very little sludge left over.
How it is fixedAir and wastewater keep carbon granules moving in a tank. The pollution breaks down on the carbon as the water passes.
How it works
Step by step.
- 1
React
Air and wastewater keep carbon granules moving.
- 2
Break down
Pollution breaks down on the carbon surface.
- 3
Separate
Clean water leaves the top, carbon stays in the tank.
Key features
Why it works well.
About INR 8 per 1,000 litres. Built up to 15 lakh litres a day.
- No secondary pollutionNothing harmful is added to the air or ground.
- Little sludgeSaves disposal cost.
- Water for reuseTreated water can be recycled.
- Proven in many industriesRunning in India and abroad.
At a glance
The details.
| Treats | Industrial wastewater and sewage |
|---|---|
| Running cost | About INR 8 per 1,000 litres |
| Largest plant | About 15 lakh litres a day |
| Ready level | Level 9 of 9 (already in use) |
| Scale | Full-size plants |
| Used in | Automobile, seafood, machine tools, sewage |
Costs are indicative and change with your water, site and plant size. We confirm them after testing a sample.
Where it is used
Who it is for.
- Automobile plants
- Seafood processing
- Machine tool units
- Sewage plants
Questions
Frequently asked questions.
Is this technology proven?
Yes. It is at ready level 9 of 9, which means: already in use. About INR 8 per 1,000 litres. Built up to 15 lakh litres a day.
What does it cost to run?
About about INR 8 per 1,000 litres. The exact figure depends on your water and the size of the plant. We confirm it after testing a sample.
Can we try it on our own water first?
Yes. We test a sample in our NABL-accredited lab and, where it helps, run a small trial on your site before you invest in a full plant.
Do you supply and install it?
Yes. We design, supply, install and start up the system, train your staff, and our lab checks the treated water.
Factory wastewater that fails COD, smells or makes too much sludge
Other ways to fix this problem.
THE NEXT STEP
Fix it on
your own site.
Send us a water sample or a test report. We will check it, confirm this method fits and tell you what it costs to run.