Rispri LabsENGINEERING A CIRCULAR FUTURE

SEWAGE, DRAINS AND WATER BODIES / 05

Ready: level 6 of 9Working model tested in real conditionsRemote sites

Ready-made sewage plant in a box.
A sewage plant that arrives in a box.

A remote camp, site office or small cluster of houses needs sewage treatment quickly. Factory-built units arrive ready to connect.

SEWAGE, BATH WATER AND OPEN DRAINSDelivered by Rispri Labs
Sewage, bath water and open drains
Sewage, bath water and open drains

What it achieves

The key numbers.

1,000 L/day

sewage units.

1,000 L/h

greywater units.

Bio-fertiliser

as a by-product.

Problem and fix

The problem this solves.

  1. 01
    The problem

    A remote camp, site office or small cluster of houses needs sewage treatment quickly.

    How it is fixed

    Factory-built units arrive ready to connect. A version for bath and kitchen water also turns waste into fertiliser.

How it works

Step by step.

  1. 1

    Deliver

    The unit arrives ready-built.

  2. 2

    Connect

    It is plugged into the sewer pipe.

  3. 3

    Treat

    Physical, biological and chemical steps clean the water.

  4. 4

    Reuse

    Treated water and fertiliser are put to use.

Key features

Why it works well.

1,000 litres a day for sewage. 1,000 litres an hour for bath and kitchen water.

  • Quick to installNo big civil work.
  • Removes nutrientsCuts nitrogen and phosphorus.
  • Greywater versionRapid settling plus ozone and bubbles cuts COD and ammonia.

At a glance

The details.

Sewage unit1,000 litres a day
Greywater unit1,000 litres an hour
Indicative costAbout INR 7.5 lakh for 1,000 L/day
Ready levelLevel 6 of 9 (working model tested in real conditions)
ScaleRemote sites

Costs are indicative and change with your water, site and plant size. We confirm them after testing a sample.

Where it is used

Who it is for.

  • Remote camps
  • Site offices
  • Village clusters

Questions

Frequently asked questions.

Is this technology proven?

Yes. It is at ready level 6 of 9, which means: working model tested in real conditions. 1,000 litres a day for sewage. 1,000 litres an hour for bath and kitchen water.

Can we try it on our own water first?

Yes. We test a sample in our NABL-accredited lab and, where it helps, run a small trial on your site before you invest in a full plant.

Do you supply and install it?

Yes. We design, supply, install and start up the system, train your staff, and our lab checks the treated water.

THE NEXT STEP

Fix it on
your own site.

Send us a water sample or a test report. We will check it, confirm this method fits and tell you what it costs to run.

Discuss your problem