Rispri LabsENGINEERING A CIRCULAR FUTURE
Rotating-disk evaporator unit with nine stacked disk rotors
Non-thermal evaporator

Non-Thermal Evaporator · Research Partnership · Field proven · Delivered by Rispri Labs

Non-thermal evaporators for ZLD.
Without the steam bill.

Rispri Labs delivers non-thermal RCD vaporisers, field-proven rotating-disk evaporators that concentrate RO reject and industrial effluent using ambient air or low-grade waste heat. Run them beside your MEE to cut its steam bill from day one, or replace the MEE in a new ZLD plant. Square and hexagonal modules, fan and pump only.

Research to reality · Rispri Labs research collaborations

What it means for you

Non-thermal evaporation: air, not steam.

No steam

Your effluent evaporates using outside air or heat you already throw away.

~80% less

Each cubic metre moved off your MEE costs about 80% less to evaporate.

Modular

Add units as production grows, instead of buying a bigger evaporator.

Performance

Built for the economics of ZLD.

The MEE is the costliest step in ZLD: evaporation takes 50–65% of a plant's capital and running cost, and a 100 KLD pharma evaporator alone can cost ₹4 to 8 crore. Our RCD (rotating contactor disk) vaporiser spreads reject over slowly turning disks and lets air evaporate it, with an air-side pressure drop of only about 10 Pa per rotor stage. Fan and pump only, no boiler steam.

24–60COP
Efficiency, against 3 to 5 for a multiple-effect evaporator
10–20kWh/m³
Electricity per cubic metre evaporated; no steam
₹80–160/m³
Running cost, against an estimated ₹430–1,070 in an MEE
270,000mg/L
TDS of the reject handled in testing, far beyond what MEE tubes tolerate without scaling

Figures are field and test data. Every project starts with a pilot on your own stream, and our NABL-accredited laboratory verifies the results before scale-up.

Challenge and response

The problems this solves.

  1. 01
    The challenge

    Steam for MEE and ATFD dominates ZLD operating cost.

    How we solve it

    Evaporate with ambient air or low-grade waste heat instead of live steam.

  2. 02
    The challenge

    High-TDS reject scales evaporator tubes and forces shutdowns.

    How we solve it

    Slow-turning disks resist scale, and online jet cleaning keeps them working.

  3. 03
    The challenge

    Spray towers and evaporation ponds lose droplets and drift.

    How we solve it

    Thin films on the disks give no droplet carryover.

  4. 04
    The challenge

    A fixed-size plant cannot grow with production.

    How we solve it

    Modular rotor units add capacity as your flow increases.

How it works

The process, step by step.

  1. FeedEffluent or RO reject fills a shallow reservoir under the rotor.
  2. RotateThe circulating flow turns textured disks that sit partly submerged.
  3. EvaporateAir sweeps the wetted disks and carries away water vapour at very low pressure drop.
  4. ConcentrateThe brine thickens for final solids recovery, while the disks are jet-cleaned online.

Two module types

Square and hexagonal RCD units.

Both run on electricity alone. The hexagonal unit gives about twice the output on similar ground, so it needs about half the modules for the same load.

Square RCD vaporiser unit with stacked green disk rotors in a yellow frame
Square unit

4 sides, 5 rotors

Footprint
About 2.4 m × 2.4 m
Output
1,650 L/day; up to 3,200 L/day in hot, dry weather
Power
About 1.4 kW (fan and pump): 33.1 kWh of electricity to vaporise 3,200 L, against about 2,140 kWh of heat to boil it off
Ground
1.8–3.5 m² per m³/day
Hexagonal RCD vaporiser unit with stacked disk rotors on a steel frame
Hexagonal unit

6 sides, 7 rotors

Footprint
About 3 m × 3 m
Output
About 3,300 L/day; up to 6,400 L/day
Ground
0.9–1.8 m² per m³/day

About 2× the output on similar ground.

Two ways to install

Retrofit beside your MEE, or replace it.

Option A · Existing MEE plants

Retrofit in parallel to cut running cost

RO reject → RCD units take part of the flow · existing MEE takes the rest

  • Cuts steam and running cost from day one
  • No change to the existing ZLD chain
  • The MEE stays as backup, so compliance is never at risk
15–25%
lower evaporation cost with 25% of the load moved
30–45%
lower evaporation cost with 50% of the load moved
Option B · New ZLD or waste heat

Replace the MEE

RO reject + waste heat → RCD units → concentrate to dryer

  • No boiler steam for evaporation
  • Chiller or condensate heat that is wasted today lifts output several times
  • Fewer units in a compact area; best on hot, dry sites

Where waste heat is available and the weather is hot and dry, the full reject load can be evaporated by RCD units alone. Option B depends on site weather and available waste heat, and is confirmed by a pilot.

Use cases

Where zero liquid discharge evaporation delivers.

RO reject

RO reject concentration

Shrink reject volume before final disposal or salt recovery.

  • Municipal and industrial RO
  • Packaged drinking water plants
  • Boiler feed RO
Effluent

Industrial ETP zero liquid discharge

Evaporate treated effluent that cannot be discharged.

  • Textile and dyeing
  • Pharma and chemicals
  • Common effluent treatment plants
Pre-concentration

Front end for existing MEE

Remove most of the water before it reaches the steam evaporator.

  • Smaller MEE for new plants
  • Lower steam use in existing plants
  • Debottleneck overloaded evaporators
Seawater

Seawater and brine concentration

Concentrate seawater or brine for salt and mineral recovery.

  • Salt works
  • Desalination brine
  • Mineral recovery
Aeration

Aeration and VOC stripping

Use the same contactor to aerate or strip volatile compounds.

  • Wastewater aeration
  • VOC stripping from groundwater
  • Odour control
Cooling

Low-energy cooling towers

Cool process water using treated wastewater or seawater as make-up.

  • Treated wastewater make-up
  • Seawater cooling
  • Evaporative condensers

Head to head

MEE, square RCD and hexagonal RCD.

ParameterMEESquare RCDHexagonal RCD
Energy usedSteam and powerElectricity onlyElectricity only
Efficiency (COP)3 to 524 to 6024 to 60
Energy per m³134 to 223 kWh of heat10 to 20 kWh10 to 20 kWh (est.)
Running cost per m³₹430 to 1,070 (est.)₹80 to 160₹80 to 160 (est.)
Output per unitWhole plant1.65 to 3.2 m³/day3.3 to 6.4 m³/day
Ground per m³/dayCompact1.8 to 3.5 m²0.9 to 1.8 m²
Water recoveredYes, as condensateNo, released to airNo, released to air
Weather effectNoneBest in dry heatBest in dry heat
ScalingTube scaling needs acid cleaning and shutdownsDisks resist scale; cleaned onlineDisks resist scale; cleaned online
Scale-upFixed vessel sizeAdd modules as flow growsAdd modules as flow grows

Dark bar = low estimate, light bar = high estimate; power at ₹8 per kWh. est. = estimate; hexagonal energy per m³ assumed equal to the square unit. With waste heat, RCD efficiency rises much further: in pharma units, chiller and condensate heat that is wasted today can raise output several times over.

Sizing example

Units needed for a 10 m³/h MEE.

Total reject 240 m³/day. Ranges run from hot, dry weather to normal conditions.

On ambient air

Load moved to RCDSquare unitsSquare areaHexagonal unitsHexagonal area
25% · 60 m³/day19 to 37110 to 215 m²10 to 1960 to 115 m²
50% · 120 m³/day38 to 73220 to 420 m²19 to 37115 to 220 m²
100% · 240 m³/day75 to 145430 to 835 m²38 to 73230 to 440 m²

With waste heat: chiller or condensate heat doubles output per unit

Load moved to RCDSquare unitsSquare areaHexagonal unitsHexagonal area
25% · 60 m³/day10 to 1955 to 110 m²5 to 1030 to 60 m²
50% · 120 m³/day19 to 37110 to 215 m²10 to 1960 to 115 m²
100% · 240 m³/day38 to 73220 to 420 m²19 to 37115 to 220 m²

Half the units

Hexagonal units need about half the modules and ground for the same load.

Full MEE replacement

With waste heat, 19 to 37 hexagonal units in about 115 to 220 m² can take the entire 240 m³/day load, at about ₹40 to 80 per m³ as the same power evaporates twice the water.

Start small

A first phase of a few modules proves the savings on site before full scale.

Areas are module footprints; allow up to 2× for spacing and access. The waste-heat case assumes 2× output per unit.

Environmental benefit

The more load moves off the MEE, the more steam, fuel, emissions and ash are cut.

Every tonne of CO₂ avoided is a potential carbon credit, so the savings can earn revenue on top of the lower running cost.

Saving (estimate)25% moved50% moved100% · standalone
Steam not raised, per day13–21 t25–42 t50–84 t
Coal saved, per year930–1,550 t1,860–3,100 t3,700–6,200 t
CO₂ avoided, per year1,500–2,500 t3,000–5,000 t6,000–9,900 t
Boiler ash avoided, per year280–620 t560–1,240 t1,100–2,500 t
Carbon credit potential, per year1,500–2,500 credits3,000–5,000 credits6,000–9,900 credits
Indicative credit value, per year₹7.5–37.5 lakh₹15–75 lakh₹30 lakh–1.5 crore

Capex falls

Units for a 25% load: 10–19 on ambient air, 5–10 with waste heat, and fewer again once optimised after the pilot.

Opex falls

About ₹80–160 per m³ on ambient air and ₹40–80 with waste heat, lower again once optimised.

Carbon credits

Avoided boiler emissions can be registered as carbon credits, or counted towards your emission-intensity targets under India's Carbon Credit Trading Scheme. Measured pilot data gives the baseline and savings that registration needs.

Estimates for a 240 m³/day MEE running 330 days a year on a coal-fired boiler. 1 credit = 1 tonne of CO₂ avoided. Credit value is illustrative, at ₹500–1,500 per credit; the actual price, eligibility and net credits depend on the registry, methodology, baseline and verification, and on the electricity the RCD units use.

Standards and regulations

Designed around the rules that apply to you.

We design each system to meet your consent conditions and the regulations for your sector, and our laboratory reports against them.

  • CPCB ZLD guidelinesTechno-economic guidance on zero liquid discharge for water-polluting industries.
  • Water (Prevention and Control of Pollution) Act, 1974Consent to operate conditions, including no-discharge clauses.
  • Environment (Protection) Rules, 1986Discharge standards for effluent that is not taken to ZLD.
  • Hazardous and Other Wastes Rules, 2016Handling and disposal of recovered salts and sludge.

Why Rispri

Proven technology. Industrial delivery.

Field-proven technology

A proven, field-tested technology from our research collaborations with IIT Bombay, IIT Kharagpur and ICT Mumbai.

Tested on your stream

Our accredited laboratory characterises your water or waste before design and verifies results after.

Engineering since 1999

The team that builds ETPs, STPs and ZLD plants across India takes each solution from pilot to full scale.

One accountable partner

Design, supply, installation, commissioning, operation and testing under one contract.

Design considerations

What we check before sizing.

  • 01 · SiteLocation and space available near the RO and MEE area.
  • 02 · WeatherLocal dry-bulb and wet-bulb temperatures; drier sites evaporate more.
  • 03 · Boiling point elevationMeasured on your reject; a low value gives the best output.
  • 04 · Waste heatChiller, condensate or blowdown heat that can warm the reject.

Next step

A verified pilot at one ZLD unit.

Pharma and chemical units with a high MEE load see the fastest payback, so that is where we usually start.

  1. Site dataLocation, reject analysis, waste heat, space and current MEE cost.
  2. Sample trial200 to 500 L of your reject run on a test module.
  3. Site pilotA 20 TR pilot unit in parallel with your MEE.
  4. Verify and scaleOur NABL-accredited laboratory measures the results, then we scale up.

Questions

Frequently asked questions.

Can the rotating-disk evaporator replace an MEE?

Yes, in new ZLD plants where waste heat is available and the weather is hot and dry: the full reject load can be evaporated by RCD units alone, with no boiler steam. In existing plants it usually runs in parallel with the MEE, taking part of the flow; moving 25% of the load cuts evaporation cost by about 15–25%, and 50% by about 30–45%. We decide after testing your reject and a site pilot.

How much does it save against an MEE?

An MEE costs an estimated ₹430 to 1,070 to evaporate one cubic metre; the RCD vaporiser costs about ₹80 to 160 on electricity alone, or ₹40 to 80 with waste heat. Every cubic metre moved off the MEE saves about ₹400 to 850.

Is the evaporated water recovered?

No. The RCD vaporiser releases the water vapour to air, while an MEE recovers it as condensate. Where you need the water or a solvent back, we offer an oil-free vapour recompression version with RCD chambers, which condenses the vapour for reuse.

How do we get exact numbers for our plant?

Through a pilot. We start with your site data and a 200 to 500 L sample trial of your reject, then run a small 20 TR pilot unit beside your MEE. Our NABL-accredited laboratory measures output, running cost and savings for your site before we size the full system.

Can it earn carbon credits?

Yes, potentially. Moving evaporation off a coal-fired MEE avoids an estimated 1,500 to 2,500 tonnes of CO₂ a year for every 25% of a 240 m³/day load, and each tonne avoided is a potential credit. Eligibility, net credits and price depend on the registry and methodology; measured pilot data provides the baseline.

Does it work in humid weather?

Evaporation rate depends on air temperature and humidity. Where ambient air alone is not enough, we add low-grade waste heat from compressors, DG sets or process cooling. Units are sized against your site's climate data.

How does it handle high-TDS reject without scaling?

The disks turn slowly through the liquid and are cleaned online with water jets, so scale does not build up the way it does inside evaporator tubes. It has handled reject of up to 270,000 mg/L TDS in testing, and the limit for your reject is confirmed in our laboratory.

Can it handle viscous or crystallising feeds, or recover solvent?

Yes. For feeds that are viscous, crystallise as they concentrate or carry a solvent worth recovering, we use oil-free vapour recompression with RCD chambers, which also lets the evaporated water or solvent be condensed and recovered.

Is the technology proven?

Yes. RCD vaporisers are a field-proven technology, running in industry as effluent and seawater concentrators. Every project still starts with a pilot on your own reject, and our NABL-accredited laboratory verifies the results before scale-up.

What maintenance does it need?

Very little. A low-head circulation pump drives the disks, there are no high-pressure parts, and cleaning is done online.

THE NEXT STEP

Prove it on
your own stream.

Send us a sample or tell us about your site. We will test it, recommend a configuration and set up a pilot.

Request a pilot